EXPERIENCED WPC DECKING MANUFACTURER

Welcome to ECAN Industries

Wood Plastic Composite Deck By ECAN

Shanghai ECAN industrial company Ltd. is a leading supplier of WPC products in China. Founded in 2008, ECAN had established a complete supply chain system integrating R&D, production, sales and after-sales services based on the advantages of our raw materials factories for wood & stone powder and professional technical team. Our strongest products are WPC decking(co-extrusion and general type), WPC railing, WPC wall panel and so on.

Other products

CONTACT US

Email: [email protected]
Phone: +86 137 6469 2158
Address: Industrial Headquarters Park, No. 365 Chuanhong Road, Pudong New District, Shanghai

ABOUT US

Shanghai ECAN industrial company Ltd. is a leading supplier of WPC products in China. Founded in 2008, ECAN had established a complete supply chain system integrating R&D, production, sales and after-sales services based on the advantages of our raw materials factories for wood & stone powder and professional technical team. Our strongest products are WPC decking(co-extrusion and general type), WPC railing, WPC wall panel and so on.

Our Factory

Shanghai ECAN industrial company Ltd adhere to green production and scientific quality management,and has passed IS9001 Quality Management and ISO14001 Environmental Management certification. meanwhile,it is equipped with advanced automatic production line and complete testing equipment.Each process is under strict quality control to ensure high and reliable quality,that complies with and fully passed zhe standards and inspections of authoritative organizations such as CE,FSC,FGS and INTERTEK.

elevated deck construction aha

How to Build a Deck

Ground-level decks also do not include the use of a ledger board in their design. Check with your local building department to determine your local code requirements when building a ground-level deck. If your deck calls for concrete piers or footings set in the ground, call 811 before you dig.

Get price

Overhead Crane Safety and Prevention

slightly raised, make pushing motion in direction of travel. Trolley Travel Palm up, fingers closed, thumb pointing in direction of motion, jerk hand horizontally. Overhead Crane Safety and Prevention Hand Signals Standard Stop Arm extended, palm down, move arm

Get price

Activity Hazard Analysis (AHA)

6b. Use taglines to control loads when elevated. 7a. Check above for overhead power lines. 7b. NEVER erect scaffolding within 10 ft (3 m) of overhead power lines. Refer to EM 1, Table 1 for Minimum Clearance from Energized Overhead Electrical Lines . 7c. NEVER. string or hang temporary power cords, wires, etc. on metal scaffolding.

Get price

Jersey City Deck Builders | Hire A Local Carpenter

JOB HAZARD ANALYSIS (JHA) FORM (Elevated Work Will Be Required) Complete daily before beginning work and review when work is complete. A copy of a site evaluation report shall remain on …

Get price

2021 Costs To Build A Deck | Average Deck Prices Per ...

New Deck Installation Cost. The average homeowner spends $2,200 to build a 10x10 foot deck, $6,160 to build a 14x20 deck, and $8,800 to build a 20x20 deck. The cost to build a deck with pressure-treated wood, hardwood, or composite is about $25 per square foot, for both materials and installation.The final price of your deck depends on the materials used, size, level built on, and any extra ...

Get price

Activity Hazards Analysis

MD485B Tower Assembly AHA Page 4 of 6 6 - 8 6. Install tower top @ 18,800 LBS. 7. Install hand rails and catwalk, and install counter deck @ 18,200 LBS. 8. Install hoist unit @ 18,900LBS. Rigging failures, suspended loads, fall exposures when setting onto turntable, dropping tools and materials, pinch points, manual manipulation of section

Get price

Activity Hazards Analysis

MD485B Tower Assembly AHA Page 4 of 6 6 - 8 6. Install tower top @ 18,800 LBS. 7. Install hand rails and catwalk, and install counter deck @ 18,200 LBS. 8. Install hoist unit @ 18,900LBS. Rigging …

Get price

SECTION 03 30 00, CAST-IN-PLACE CONCRETE

Store in suitable watertight building in which floor is raised at least 300 mm (1 foot) above ground. Store bulk cement // and fly ash // in separate suitable bins. Deliver other packaged materials for use in concrete in original sealed containers, plainly marked with manufacturer's name and brand, and protect from damage until used.

Get price

SURFACE PREPARATION AND PAINTING STRUCTURAL STEEL …

393.453 BRIDGE CONSTRUCTION MANUAL Novem The most common paint systems currently used on new steel bridge elements are zinc-rich primers (organic or inorganic) with an epoxy mid-coat and a urethane top coat. The mid-coat and top coat may also be applied over hot-dip galvanizing with proper surface preparation. The primer, intermediate,

Get price

Elevated Concrete Porch Slab Construction: Finishing the ...

The weather has been fair for a couple of weeks so we were able to finish setting the steel I-beams and moved some deck pan into place to get a feel for what...

Get price

EM 1 30 Nov 14 Section 27 TABLE OF CONTENTS …

Concrete, Masonry, Roofing and Residential Construction 27.A General. The fall protection threshold height requirement is 6 ft (1.8 m) for ALL work covered by this Section, unless specified differently below, whether performed by Government or Contractor work forces, to include residential (wood) construction and scaffolding work. > See Section 21.

Get price

Deck Details Based on the 2012 International Residential ...

footage of the proposed construction (e.g. deck) together and dividing it by the total area of the lot. For example, a lot is developed with a house and a garage that have a total square footage of 1,500 square feet. The applicant wants to con-struct a deck that is four feet in height and 250

Get price

Activity Hazard Analysis (AHA)

Contractor Required - AHA EM 1, para 01.A.13.a: AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials and the control measures to be implemented to eliminate or

Get price

How to Build a Deck Step by Step | Building a Deck | Trex

Then find links, demos and more for how to build a deck yourself step by step. In the meantime, kick things off with our deck building and planning tools. Building a deck has never been easier. If playback doesn't begin shortly, try restarting your device. Videos you watch may be added to the TV's watch history and influence TV recommendations.

Get price

MODULE 2a SHORING BASICS

FEMA NATIONAL US&R RESPONSE SYSTEM STRUCTURAL COLLAPSE TECHNICIAN 00 MODULE 2a SHORING BASICS SM 2A 1 The Objectives of this unit are as stated in the adjacent slides. The overall purpose of this unit is to explainWHY we build shoring in the FEMA Response System in the way that we do. In SHORING, PART B the student will be informed as toHOW each type of

Get price

SURFACE PREPARATION AND PAINTING STRUCTURAL STEEL …

393.453 BRIDGE CONSTRUCTION MANUAL Novem The most common paint systems currently used on new steel bridge elements are zinc-rich primers (organic or inorganic) with an epoxy mid-coat and a urethane top coat. The mid-coat and top coat may also be applied over hot-dip galvanizing with proper surface preparation. The primer, intermediate,

Get price

Hazard Analysis

Building Information Modeling (BIM) for Safety Planning. BIM is a concept that offers software technology application (app) that integrates digital building information for hazard identification and …

Get price

Deck Construction Guide

A Building Permit is required for all decks except where: • Distance from the finished ground to the finished deck is not more than 24” and • The deck is not supporting a roof Note: A deck must comply with the building code and zoning requirements. For more information, contact The City of Oshawa’s Building Department at 5658.

Get price

Job safety analysis – Installing wall frames and roof ...

Australian Standard 1684. 99: Residential timber framed construction Australian Standard 97: Installation of nail plated timber All equipment is to be maintained, checked and inspected in accordance with the manufacturer and WorkSafe requirements. Register of all …

Get price

Job Hazard Analysis Template | JHA | ASCC

The ASCC Safety & Risk Management Council is dedicated to making jobsite safer for specialty and general contractors. ASCC members gain access to Job Hazard Analysis forms to assist in on-the-job step-by-step hazard identification and elimination. See the full list of templates online.

Get price

Job Description Hazard Identification Hazard Controls ...

Reference: Subpart Q, Concrete and masonry construction. OSHA Standard Job Description Hazard Identification Hazard Controls Laying out footing forms 1. Cutting form lumber with …

Get price

How to Build a Raised Deck

Raised decks require a railing around the perimeter, and they require a building permit. Elevated deck plans also include the use of a ledger board in their design. Check with your local building department to determine your local code requirements when building a raised platform. If your deck …

Get price

Design and Construction Guidance for Breakaway Walls

damage to the elevated building or the supporting founda-tion system (see Figure 1). Obstructions below an elevated building can signifcantly increase the . potential for food damage by increasing the surface area subject to wave impact and ve-locity fow. The NFIP regulations also specify that enclosures may be used only for parking of vehicles,

Get price

Scaffolding Systems Aerial Work Platforms Access ways

Elevated Work Platforms A vertically-adjustable, integral chassis, power operated work platform, which may be horizontally extended or rotated relative to the elevating mechanism; an integral frame boom supported power operated elevation work platform which either telescope, articulate, rotate, or extend beyond their base dimensions. (See page 6)

Get price

Activity Hazard Analysis (AHA)

Contractor Required - AHA COE EM 1, para 01.A.13.a: AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, …

Get price

Sample Fall Rescue Plan for Bridge Work

elevated work surface and is suspended in a full body harness, to include self-rescue or mechanically aided rescue. (2) Self Rescue – An act or instance of an employee using their fall protection and rescue equipment to perform a rescue without having to put other workers at risk.

Get price

Water Storage Tank Safety Standards

employee to be supported on an elevated vertical or inclined surface, such as a wall, pole or column and work with both hands free from the body support. • Rigged to prevent fall of greater than 2 feet. • Anchorage capable of supporting 3,000 lbs (static weight) or twice potential impact load, whichever is greater

Get price

How to Build a Deck: Design and Layout

 · Deck boards are typically 1/2 inches wide, so try to plan a deck size that won't leave narrow pieces at the ends. Create your design so that the railings are clear of windows and out-swinging doors. Once you have a basic layout, bring it to Lowe's to have an associate put together professional deck plans and a materials list.

Get price

Deck Inspection Standard | American Society of Home ...

Deck construction guideline— A written and recognized authoritative reference that describes generally accepted deck construction practices; examples include, but are not limited to, The American Wood Council publication Design for Code Acceptance 6 (DCA ), and The International Residential Code for One and Two-Family Dwellings.

Get price

How To Build An Elevated Deck: Step-By-Step Instructions ...

An elevated deck is the classic model you’re going to see in most backyards. In the process of deck construction—and construction in general—nothing ever goes perfectly according to plan. Whether you’ve been building for three days or 30 years, you know this.

Get price

© 2021 ECAN Industrial Co., Ltd. All rights reserved